ZILART — new development, Danilovsky
Overview
ZILART is an LSR Group project in the Danilovsky district, on Avtozavodskaya Street. More than 65 hectares have been set aside for the new neighbourhood: about 70 per cent for housing and retail and social buildings, and the remaining 30 per cent for greenery. The complex is under construction, with completion in 2027, and flats start from 17,389,077 RUB.
The site is divided into functional zones: residential quarters, a 20-hectare park, a riverside leisure area along the Moskva, an education cluster and a commercial zone along a 1.2 km central boulevard. The housing is monolithic buildings of 3 to 43 storeys, 30 in all. Each quarter has its own style, and nine studios worked on the concept, including Hani Rashid's ASYMPTOTE ARCHITECTURE, Gerasimov and Partners, Mezonproekt, Tsimailo Lyashenko & Partners and SPEECH. The residential buildings share clinker brick, while public buildings use decorative concrete and natural stone. About 20,000 people will live in the neighbourhood.
The first phase has four single-section buildings on a shared podium, with commercial units on the ground floor and parking below. The perimeter has round-the-clock CCTV and access by magnetic card. Zilart GRAND is a business-class brick-and-monolith building with 1,679 flats; in section five, flats are handed over finished.
The park and embankment will provide almost 20 hectares of greenery: cycle and running tracks, roller-skate and bicycle hire, sports and play areas and cafes, with a park of over 4 hectares on the river front with pavilions, piers and steps down to the water. Along the boulevard come business and retail centres, medical and fitness centres, cafes, galleries, the Hermitage Moscow museum centre, a children's entertainment centre, puppet and drama theatres and a concert hall. An underground car park runs beneath the boulevard, with around 12,500 spaces in the complex. The education centre includes two schools and two kindergartens, with another school and ten kindergartens being built beside it.
The complex is 200 m from the Third Ring Road. Avtozavodskaya metro station and the ZIL transport interchange (783 m) are within walking distance, and plans call for rebuilding nearby streets and opening Tekhnopark metro station. A shop is 170 m away, a park 183 m, a pharmacy 272 m and a school 334 m.
Listed on Sep 1, 2026
Project facts
- Storeys
- 3–43
- Apartments in scheme
- 1,679
- Segment
- бизнес
- Handover
- Fully finished
- Stage
- Under construction
Location
Danilovsky, Moscow
Nearby
Infrastructure within walking and transport distance.
- Transport780 m
- School370 m
- Supermarket170 m
- Healthcare270 m
- Park180 m
Mortgage calculator
Estimate your monthly payment.
Estimates only. Final rates depend on bank approval and local regulations.